Project Completed September 2018.
This project consists of installing 6ft wide sidewalks between Washington Road and Camp Creek Parkway.
The project also consists of milling of existing asphalt to a depth of two and one half (2.5) inches and overlaying two and one half (2.5) inches of new pavement material along Desert Drive. The existing curb line will be shifted to allow installations of sidewalks within the existing right of way.
In addition, Pedestrian Crossing Signs and Rectangular Rapid Flashing Beacons (RRFB) Push-button Activated Crosswalk System be installed at the proposed mid-block crosswalk near Kenelworth Drive.
The contract was awarded to Mullins Bros Paving Contractors Inc. For more information on this project please contact Cadell Hall, Engineer II, at (404) 669-4321 or chall@eastpointcity.org.
Purpose/Project: Tier 1 Maintenance and Safety Enhancements
Department | Public Works |
Budget | $500,000.00 |
Funding Source | TSPLOST |
Spent | $414,076.80 |
Estimated Start Date | April 2018 |
Estimated Completion Date | July 2018 |
Project Manager | Cadell Hall |