Details

Contract Awarded to Excellere Construction, LLC

This project is the sidewalk and landscape improvements in the city of East Point along both sides of CR1211/Semmes Street from Washington Avenue to Norman Berry Drive for a total of 0. 70 mile. The existing project area consists of an asphalt roadway surface that is worn and aged, concrete sidewalks that are cracked, uneven, and undermined in some areas by storm runoff due to deteriorated curb and gutter. The purpose of this project is to make the pedestrian and bicycle interaction with automobiles safer, and to improve the aesthetic value of the Semmes Street area. Additionally, the general appearance of the area will also be improved. The project proposes to resurface the existing roadway pavement, provide monolithic curb and gutter to facilitate drainage, widen the sidewalk on each side of the road, add bike lanes, and landscaping to improve the appearance of the right-of-way. Landscaping will consist of grassing strip and disturbed areas, and replacing trees if required.

 

For more information on this project please contact Cadell Hall, Transportation Division Manager, at (404) 669-4321 or chall@eastpointcity.org.

 

FHWA/ GDOT Funded.


Department Public Works
Budget $1,163,999.51
Funding Source FHWA (GDOT)
Spent $1,163,999.51
Estimated Start Date June - July 2020
Estimated Completion Date September 2021
Project Manager Cadell Hall and Jeremy Goodwin